SD
SIGNAL+DRAHT | Ausgabe 06/2011

Ensuring rail integrity in the absence of track circuits

Juni 2011 | ITC IRSE

Rail integrity is the responsibility of the permanent way. So there may be a problem ensuring rail integrity in the absence of track circuits. This is an article in the series “Obstacles to the introduction of ETCS Level 3”.