SIGNAL+DRAHT | Issue 06/2011
Ensuring rail integrity in the absence of track circuits
Rail integrity is the responsibility of the permanent way. So there may be a problem ensuring rail integrity in the absence of track circuits. This is an article in the series “Obstacles to the introduction of ETCS Level 3”.