SD
SIGNAL+DRAHT | Ausgabe 07-08/2025

ETCS L1 FS plus with L2-Features: a new architecture in service at the Luxembourg railway

August 2025 | Redaktion

After completing the switch to European Train Control System (ETCS) in 2017, Luxembourg’s existing system has increasingly reached its limits. As such, a comprehensive modernisation program was launched to optimise operations and leverage modern technology. The aim was to integrate ETCS functions into the digital interlocking system and reduce trackside signalling. An innovative solution has been chosen and implemented in collaboration with Scheidt & Bachmann (S&B) on the northern line to the Belgian border...

Mehr Artikel aus dieser Ausgabe: