SIGNAL+DRAHT | Ausgabe 11/2015
Implementation of ERTMS/ETCS Level 1 in the Slovenian sector of Corridor D
The project for the implementation of ETCS Level 1 in the Slovenian sector of Corridor D started in 2012. It is a major contribution to the interoperability of the railway infrastructure in Europe. With the finalization of the ongoing ETCS L1 project approximately one quarter of the Slovenian railway network will be equipped with ETCS Level 1. This article describes both, the typical process of an ETCS Level 1 project as well as the characteristics of the project realisation in Slovenia.