SD
SIGNAL+DRAHT | Ausgabe 04/2025

Future logical system architecture for driverless and unattended train operations – Part 2

April 2025 | Redaktion

This is a continuation of an article with the same name that appeared in SIGNAL+DRAHT 11/2024. It continues the description of the logical architecture started in the first part of the article. It details a prototype using the proposed logical architecture for GoA 4 and presents an analysis of its impact on the other onboard modules.

Mehr Artikel aus dieser Ausgabe: